The Feltham and Wokingham area re-signalling project was commissioned in February 2024. The Feltham and Wokingham re-signalling project involves signal upgrade of 129km of railway track in Southwest ...
The most recent situation was reported by Southern Rail at 8.40am. A post on X (formerly Twitter) read: “Passengers are causing a disturbance on a train between Shoreham-by-Sea and Worthing. “The line ...
Southern Rail reported at 6.15am that, ‘due to a speed restriction over defective track’ – between Brighton and Haywards Heath – ‘trains have to run at reduced speed on all lines’. This incident came ...